15/17mm Tie Rod Use in Formwork System for Construction

Product Details
Customization: Available
Certification: ISO, SGS
Material: Steel
Still deciding? Get samples of US$ 3/Meter
Request Sample
Gold Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, IATF16949
  • 15/17mm Tie Rod Use in Formwork System for Construction
  • 15/17mm Tie Rod Use in Formwork System for Construction
  • 15/17mm Tie Rod Use in Formwork System for Construction
  • 15/17mm Tie Rod Use in Formwork System for Construction
  • 15/17mm Tie Rod Use in Formwork System for Construction
  • 15/17mm Tie Rod Use in Formwork System for Construction
Find Similar Products

Basic Info.

Model NO.
WJ-FTR
Type
Wall Formwork
Diameter
12/15/17/22mm
Surface Treatment
Zinc Plate or HDG
Technic
Cold/Hot Rolling
Standard
En74, En74-a, En74-B, En74-Bb, BS1139
Delivery Date
10-20 Days
Market
All Over The World
Raw Material
45# Carbon Steel
Package
Woben Bags+ Steel Pallet
Transport Package
Bundle or Pallets
Specification
1m, 2m, 3m, 6m
Trademark
WJ
Origin
China
HS Code
73084000
Production Capacity
100000m/Month

Product Description

1. Product description

Name 15/17mm Tie Rod use in formwork system for construction
Diameter 12mm,15mm,17mm,22mm
Length 1mm,3mm,6mm or as you want
Technic cold/hot rolling
Certificate ISO:9001,SIGMA
Standard En74, En74-a, En74-B, En74-Bb, BS1139
Raw Material 45# steel
Package Woben Bags+ Steel Pallet
Surface Treatment Zinc plated or HDG
Delivery date 15-20 days after receive the deposit
Service OEM service

15/17mm Tie Rod Use in Formwork System for Construction
15/17mm Tie Rod Use in Formwork System for Construction
15/17mm Tie Rod Use in Formwork System for Construction
15/17mm Tie Rod Use in Formwork System for Construction
2. ISO Certificate

(We are also doing the SIGMA certificate, and we will get the result in about 2 months)
15/17mm Tie Rod Use in Formwork System for Construction
3. Delivery and Package
Generally, we use the woven bags, steel plate and  Wooden box to package.
We will arrange delivery within 20 days of receiving your deposit


15/17mm Tie Rod Use in Formwork System for Construction
15/17mm Tie Rod Use in Formwork System for Construction
4. Company Introduce
Rizhao Weijie a professional manafacture of forged scaffolding couplers and formwork accessories in China. We specialize in this filed over 20 years, so we accumulated a lot of experience. Moreover, we have our own profesional technical and after sales team to solve problems between different client. If you want to add another supplier, I believe we will be a good choice.
15/17mm Tie Rod Use in Formwork System for Construction
15/17mm Tie Rod Use in Formwork System for Construction
5. Contact
Rosa Dai (Sales manager)
Rizhao Weijie Metal Processing co., ltd.
Web: pezonmetal.en.made-in-china.com


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier