Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m

Still deciding? Get samples of $ !
Request Sample
Product Details
Customization: Available
After-sales Service: Online Technical Support
Warranty: 5years
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Year of Establishment
2017-09-25
Number of Employees
118
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m pictures & photos
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m pictures & photos
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m pictures & photos
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m pictures & photos
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m pictures & photos
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m pictures & photos
  • Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
  • Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
  • Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
  • Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
  • Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
  • Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m

Find Similar Products

Overview

Basic Info.

Material
Metal
Type
Fixed
Structural Style
Multi-Pole Scaffolding
Framework
Combined Scaffolding
Supporting Mode
Projecting Scaffolding
Lapping Form
Double Scaffolding
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Couplers
Construction Properties
Installation Scaffold
Name
Right Angle Clamp
Weight
1kg
Size
1m
Advantage
Competitive Price, Good Quality
MOQ
1000PCS
Logo
as Your Request
Model No.
Pz-Fw02
Surface Treatment
Electro Galvanized, HDG
Transport Package
Pallets
Specification
45 Steel+Q235 Steel
Trademark
Pezon
Origin
Rizhao, Shandong
HS Code
73084000
Production Capacity
300000PCS/Year

Product Description

Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
Specification
                Name:               
Hot tie rod
        Product Model:  
PZ-FW02
               weight:
1kg
         Surface Treatment:
Electro Galvanized , Hot Dip Galvanized.
            Material:
45# steel+Q235steel
            Certificate:
SGS , ISO9000 , Sigma
         Delivery time:
10-15 days after order confirmation
            M.O.Q:
1000pcs
         Advantage:
1.High Quality  2.Professional service 3.Competitive price
              Notes:
Special marks can be made according to customers requirements.It is available to produce by customer drawing.
            Pakage:
woven bag+steel pallet
       Main products:
Different kinds of scaffold coupler, Ringlock scaffolding system, 

Cuplock Scaffolding System, Kwikstage scaffolding  system,

 shoring prop, formwork system, frame system, Accessories
Packing & Delivery
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
We can customize the packaging according to the customers' requirements. Moreover, we have a highly professional logistics company that can deliver the products to the destination promptly and safely.
Company Profile
Company Name:
Shandong Pinzheng Metal Products Co., Ltd. (formerly Rizhao Weijie Metal Processing Factory) is located in the economic and technological development zone  of Rizhao, Shandong Province. Our company was founded in 2017, the workshop covers an area of more than 20,000 square meters; there are 120 employees, including 12 technical engineer, and 95 skilled forging and processing personnel. Our company has comprehensive product quality testing equipment, as well as 6 forging production lines of 1600 tons, 630 tons and more than 60 sets of mechanical processing equipment. At present, the company's products mainly include high-end construction formwork accessories, scaffolding accessories which are exported to the European market; trailer axles and disc seats exported to the United States; and cylinder heads, shift forks, engine support brackets and ship accessories exported to the domestic market.
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
Certification:
Our company adheres to the concept of "customer first, quality first; fine management, honest management". We have passed the ISO9001:2015 international quality system certification, IATF16949:2016 forged part qualtity system certificate and EN74 European scaffolding couplers certificate. We sincerely welcome your visit and look forward to work with you!
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
Our exhibition:
Every year, we participate in various exhibitions worldwide, enabling our customers to accurately and quickly find the products they need.
At every exhibition, we receive visitors from all over the world, and we hope to have the opportunity to meet different people from all over the world.
Photos of other products produced:

Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
Dw 15/17 Hot Rolled Tie Rod for Formwork Tie Back 1m and 6m
Our Product Catagories:
1.High end construction formwork accessories for world famous top brand company(tie rod,wing nut,panel clamps,tekko,shoring props,forks)
2.Scaffolding clamps/couplers/jack nut jack bases/walking planks etc all accessories.
3.Ringlock scaffolding system/Cuplock scaffolding system/Frame scaffolding system/Kwickstage scaffolding system.
4.Trailer axles and dics seats,cylinder heads,shift forks,engine support brackets and ship accessories.  
5.Aluminium ladders and walking steps etc.
FAQ:
Q1: Are you a factory or trading company?
A: We are a factory specializing in manufacturing all kinds of scaffolding material.
Q2: What certificates do you have?
A: We have ISO 9001,SGS,SIGMA certification.
Q3: Where is the loading port? 
A: Qingdao port
Q4: What's the MOQ of the product?
A: Different item has different MOQ. Normally 2000pcs is preferred.
Q5: How long is the production cycle after ordering?
A: General it is about 15-30 days.
Q6: What is the payment methods?
 A: T/T payment is preferred and other payment terms is accepted.
Q7: Can I get some samples? 
A: Yes, Sample is free, but usually the customer will pay for the shipping cost.

Send your message to this supplier

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now